Desalination Project

VICTORIA

Best Bar supplied 4800T of reinforcing steel to this project over a 24 month period and 1500T of this was prefabbed in our yard and delivered to site over a 12 month period. We suggested that we could prefabricate some elements of the project for Thiess Degremont which would speed up the build time on the project for them. They saw the value in this so we
Prefabricated the walls for the Sea Water Lift pump Station which included mats of N32 at 150 centres, 12000mm long x 4800 wide. These mats weighed 5T each which made logistics a major issue to overcome especially as our yard was 150km away from site. Because of Best Bars success in this we were also given the opportunity to supply many other parts of the project we supplied over this 24 month period such as the Electrical pit bases, Lime storage & Saturation building, Launder structure & Balance of plant.


Desal Fab walls 3 copyDesal Walls 1profileThe image above is the desalination project in December 2014