This upgrade of the Doncaster Shopping Centre went for 18 months and we supplied just over 2000T of reo for Caelli. The job had a large footprint with 6 cranes operating on site so ensuring the correct reinforcing steel for the correct area was loaded accordingly was a large undertaking. We had several different areas on each delivery so colour coding tags and organising loads was very important as there were numerous drop points on site to be met.

We had a scheduler working onsite for the project who was scheduling directly into our system. This saved a lot of time for the client as changes to how the project was to be built and formed was a daily occurrence, therefore this direct access to the scheduler produced a quick turnaround for supply.